“The big driver is (that) it’s going to stop the overflows,” city engineer Leland Dicus said.

The sewer improvements are the result of problems that started about 15 years ago when the system overflowed during the heavy rains of that hurricane season, Dicus said. The overflow came out through manhole covers and dumped sewage in the street that eventually made its way to the bay. In all, Dicus said, about 30 million gallons of overflow came out of the system.

Why should you read this? Just the numbers: “$37M”, “30 million gallons of overflow.” Tampa Bay Times, January 2015